Rapid assembly lines model building based on template approach and classification of problems using the cladistics technique /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
United Kingdom :
Cranfield University,
2012.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01256nam a2200301 a 4500 | ||
---|---|---|---|
003 | UKM | ||
005 | 20121127190500.0 | ||
008 | 120424s2012 xxka m 000 0 eng | ||
020 | |a Hadiah | ||
039 | 9 | |a 201211271905 |b baizura |c 201210230855 |d latihan |c 201210221638 |d latihan |y 04-24-2012 |z miza | |
040 | |a UKM | ||
090 | |a TS178.4.Z338 2012 tesis | ||
090 | |a TS178.4 |b .Z338 2012 | ||
100 | 0 | |a Zainal Rasyid Mahayuddin. | |
245 | 1 | 0 | |a Rapid assembly lines model building based on template approach and classification of problems using the cladistics technique / |c Zainal Rasyid Mahayuddin. |
260 | |a United Kingdom : |b Cranfield University, |c 2012. | ||
300 | |a xiii, 405 p. : |b ill. ; |c 30 cm. | ||
502 | |a Theses (P.hD) - Cranfield University, 2012. | ||
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Dissertations, Academic |z United Kingdom. | |
650 | 0 | |a Manufacturing processes. | |
650 | 0 | |a Assembly-line methods. | |
907 | |a .b15339270 |b 28-05-21 |c 12-11-19 | ||
998 | |a t |b 04-11-12 |c m |d x |e - |f eng |g xxk |h 0 | ||
914 | |a vtls003498157 | ||
990 | |a nm | ||
991 | |a Koleksi Asia Tenggara | ||
945 | |a TS178.4 .Z338 2012 (00008051630) |g 1 |i 00002078237 |j 0 |l t0040 |n No. of pieces: 1 |o - |p MYR0.00 |q - |r - |s - |t 3 |u 0 |v 0 |w 0 |x 0 |y .i20053186 |z 12-11-19 |