Case study of arrow (Malaysian NGO): creation & implementation of project performance indicators /
This study attempts to showcase and analyse project performance indicators developed by ARROW for their current WHRAP II project. Areas addressed will be a) reason for creating indicators. b) what type of indicators are created, c) how they are implemented, d) results and uses of these indicators, a...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Kuala Lumpur: Management Centre, International Islamic University Malaysia.
2010
|
Subjects: | |
Online Access: | http://studentrepo.iium.edu.my/handle/123456789/3019 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 030430000a22003610004500 | ||
---|---|---|---|
008 | 101129t2010 my a g m 000 0 eng d | ||
040 | |a UIAM |b eng | ||
041 | |a eng | ||
043 | |a a-my--- | ||
050 | 0 | 0 | |a HF5549.5.P37 |
100 | 1 | |a Alkaf, Dariq Mustafa Dahir |9 112319 | |
245 | 1 | |a Case study of arrow (Malaysian NGO): |b creation & implementation of project performance indicators / |c by Dariq Mustafa Dahir Alkaf | |
260 | |a Kuala Lumpur: Management Centre, International Islamic University Malaysia. |c 2010 | ||
300 | |a vi, 137 leaves : |b ill. ; |c 30cm. | ||
336 | |2 rdacontent | ||
337 | |2 rdamedia | ||
338 | |2 rdacarrier | ||
500 | |a Abstracts in English and Arabic. | ||
500 | |a " Project paper submitted in fulfilment of the requirement for the degree of Master of Business Administration."--On t. p. | ||
502 | |a Thesis (MBA)--International Islamic University Malaysia, 2010. | ||
504 | |a Includes bibliographical references (leaves 145-148) | ||
520 | |a This study attempts to showcase and analyse project performance indicators developed by ARROW for their current WHRAP II project. Areas addressed will be a) reason for creating indicators. b) what type of indicators are created, c) how they are implemented, d) results and uses of these indicators, and, e) possible modifications that might be needed. Unstructured interviews with program heads, financial controllers, and project representatives are undertaken to form an understanding of the indicators. The indicators which are determined in line with the objectives of the project are then explored and reviewed based on the literature available on project performance indicators to gain better understanding of them. Results and uses from case studies using these indicators will then be reviewed. The case studies considered for this study are from 3 areas where WHRAP II interventions were made in Bangladesh, namely Tangail, Palash and Shaghata. Follow-up and tracking of the utilization of these indicators in these areas and their outcome will be demonstrated. However, this study is not going to conduct a performance audit or carry out the information collection for the indicators. This study is solely concerned with the indicators used to assess the performance of this project. | ||
650 | 0 | |a Performance technology |9 112320 | |
650 | 0 | |a Nonprofit organizations |x Management |9 112321 | |
655 | 7 | |a Theses, IIUM local | |
690 | |a Dissertations, Academic |x Management Centre |z IIUM |9 34390 | ||
710 | 2 | |a International Islamic University Malaysia. |b Management Centre |9 34391 | |
856 | 4 | |u http://studentrepo.iium.edu.my/handle/123456789/3019 | |
900 | |a sbh-ls | ||
942 | |2 lcc |n 0 | ||
999 | |c 434192 |d 465948 | ||
952 | |0 0 |6 T HF 005549.5 P37 A415C 2010 |7 0 |8 THESES |9 757153 |a IIUM |b IIUM |c MULTIMEDIA |g 0.00 |o t HF 5549.5 P37 A415C 2010 |p 00011196723 |r 2017-10-19 |t 1 |v 0.00 |y THESIS | ||
952 | |0 0 |6 TS CDF HF 5549.5 P37 A415C 2010 |7 0 |8 THESES |9 845077 |a IIUM |b IIUM |c MULTIMEDIA |g 0.00 |o ts cdf HF 5549.5 P37 A415C 2010 |p 00011284748 |r 2017-10-26 |t 1 |v 0.00 |y THESISDIG |