Investigation on construction project delays in Malaysia /

Delay is commonly happens in the construction industry that causes time extension for contractors to complete the construction project and as well as increases the cost of project. It tends to occur among small and medium contractors with limited personnel capabilities and abilities. The objectives...

Full description

Saved in:
Bibliographic Details
Main Author: Amalin Sofia binti Ismail (Author)
Format: Thesis
Language:English
Published: Kuala Lumpur : Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia, 2017
Subjects:
Online Access:Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 031230000a22003250004500
008 180328s2017 my a f m 000 0 eng d
040 |a UIAM  |b eng  |e rda 
041 |a eng 
043 |a a-my--- 
050 0 0 |a TH441 
100 0 |a Amalin Sofia binti Ismail,  |e author 
245 1 0 |a Investigation on construction project delays in Malaysia /  |c by Amalin Sofia binti Ismail 
264 1 |a Kuala Lumpur :  |b Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia,  |c 2017 
300 |a xv, 208 leaves :  |b illustrations ;  |c 30cm. 
336 |2 rdacontent  |a text 
337 |2 rdamedia  |a unmediated 
347 |2 rdaft  |a text file  |b PDF 
502 |a Thesis (MQSIP)--International Islamic University Malaysia, 2017. 
504 |a Includes bibliographical references (leaves 185-200). 
520 |a Delay is commonly happens in the construction industry that causes time extension for contractors to complete the construction project and as well as increases the cost of project. It tends to occur among small and medium contractors with limited personnel capabilities and abilities. The objectives of the study are to identify factors causing delays, to determine the implications of delays and as well as to suggest solutions to reduce delays that happen in the construction projects. The data was collected through questionnaire surveys and semi-structured interviews that were conducted within area of Kuala Lumpur and Selangor. A total of 43 questionnaires were collected from small and medium contractors firms and the data collected were analysed using Statistical Social Package Science (SPSS) software. Semi-structured interviews were further conducted among three targeted contractors and reported accordingly. The study found out that financial constraints, delays in subcontractors' works and improper project planning are the major factors that causing delays. Furthermore, the study also revealed that delays are mostly causing both time and cost overruns. The results obtained concluded that the most significant approaches suggested to reduce delays include pay progress payment on time, manage financial resources efficiently, proper project planning and also effective communication between contractors and labours. Keywords: Delays, Small and medium contractors, Factors, Implications, Approaches. 
596 |a 1 
598 |a NEW 
655 7 |a Theses, IIUM local 
690 |a Dissertations, Academic  |x Department of Quantity Surveying  |z IIUM 
710 2 |a International Islamic University Malaysia.  |b Department of Quantity Surveying 
856 4 |u http://studentrepo.iium.edu.my/handle/123456789/2688  |z Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library. 
900 |a sbh-aaz-ls-naw 
999 |c 440096  |d 472631 
952 |0 0  |6 T TH 000441 A482I 2017  |7 0  |8 THESES  |9 763539  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o t TH 441 A482I 2017  |p 11100379150  |r 2019-04-04  |t 1  |v 0.00  |y THESIS 
952 |0 0  |6 TS CDF TH 441 A482I 2017  |7 0  |8 THESES  |9 856514  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o ts cdf TH 441 A482I 2017  |p 11100379151  |r 2019-04-04  |t 1  |v 0.00  |y THESISDIG