Investigation on the state and practice of Building Information Modelling (BIM) - based costing in the Malaysian construction industry /

The use of Building Information Modelling (BIM) and BIM-based cost management is still in its early stages of adoption in Malaysia. BIM has proven to be an important tool to take the construction industry into the next stage, yet many hinders exist on the way to fully incorporating it in the Malaysi...

Full description

Saved in:
Bibliographic Details
Main Author: Mujalli, Samar Ahmed Shaif (Author)
Format: Thesis
Language:English
Published: Kuala Lumpur : Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia, 2018
Subjects:
Online Access:Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 040800000a22002890004500
008 180813s2018 my a f m 000 0 eng d
040 |a UIAM  |b eng  |e rda 
041 |a eng 
043 |a a-my--- 
100 1 |a Mujalli, Samar Ahmed Shaif,  |e author 
245 1 0 |a Investigation on the state and practice of Building Information Modelling (BIM) - based costing in the Malaysian construction industry /  |c by Samar Ahmed Shaif Mujalli 
264 1 |a Kuala Lumpur :  |b Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia,  |c 2018 
300 |a xi, 153 leaves :  |b illustrations ;  |c 30cm. 
336 |2 rdacontent  |a text 
347 |2 rdaft  |a text file  |b PDF 
502 |a Thesis (MSAFM)--International Islamic University Malaysia, 2018. 
504 |a Includes bibliographical references (leaves 93-96). 
520 |a The use of Building Information Modelling (BIM) and BIM-based cost management is still in its early stages of adoption in Malaysia. BIM has proven to be an important tool to take the construction industry into the next stage, yet many hinders exist on the way to fully incorporating it in the Malaysian construction industry. Moreover, BIM-based cost management is a vital tool that has the ability to save time and costs that is not being fully employed in the country. This research seeks to investigate the adoption of BIM in cost management within the Malaysian construction practice. The study comes to address the lack of BIM and BIM-based adoption. It seeks to identify the current states of BIM and BIM-based cost management in Malaysian practice and to take a closer look at the guidelines and standards available in the country. It also focuses on the difficulties faced when trying to adopt BIM and more specifically BIM-based cost management. Two main approaches are utilized to collect data. Primary data collection is through a semi-structured interview with eleven respondents working in the construction industry. Secondary data collection is through previously published data and research on the subject. The choice of study respondents is based on a set criterion that ensures the respondents have knowledge working with BIM and in construction related occupations to represent a small sample of the people working in the Malaysian construction practice. The outcome of the interviews concluded that the state of BIM and BIM-based cost management adoption in Malaysian is still at its early stages. That was due to a number of reasons including lack of awareness and motivations towards implementing it. Another finding showed that the current standards and guidelines issued by the Malaysian government are not yet up to the level needed by companies. A lot of companies tend to adopt international standards and localize some of their own to fill the gap of not having sufficient information issued by the Malaysian authorities. In regards to BIM-based cost calculations, this study found that is yet to be fully explored in Malaysia due to different reasons, one of which is the lack of experienced workers. Respondents also expressed difficulties implementing BIM-based calculations due to the general low adoption of BIM. Another key finding is that the biggest change can be made through the government's full incorporation and push for more BIM oriented construction practice in Malaysia. 
596 |a 1 
655 7 |a Theses, IIUM local 
690 |a Dissertations, Academic  |x Department of Quantity Surveying  |z IIUM 
710 2 |a International Islamic University Malaysia.  |b Department of Quantity Surveying 
856 4 |u http://studentrepo.iium.edu.my/handle/123456789/2689  |z Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library. 
900 |a sbh to aaz-naw 
999 |c 441159  |d 472459 
952 |0 0  |6 XX(550860.1)  |7 0  |8 THESES  |9 762042  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o XX(550860.1)  |p 11100405373  |r 1900-01-02  |t 1  |v 0.00  |y THESIS 
952 |0 0  |6 XX(550860.1) CD  |7 5  |8 THESES  |9 857528  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o XX(550860.1) CD  |p 11100405374  |r 1900-01-02  |t 1  |v 0.00  |y THESISDIG