Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris

Outside the buildings, the life of paint film is usually thought to have ended when it is faded, dirty, chipped or scratched. This predicament almost found at numerous buildings in Malaysia and as a study case, several buildings in campus UiTM. This problem can cause divan look where the facade of t...

Full description

Saved in:
Bibliographic Details
Main Author: Idris, Mukram
Format: Thesis
Language:English
Published: 2002
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/15525/1/TD_MUKRAM%20IDRIS%20AP%2002_5.PDF
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.15525
record_format uketd_dc
spelling my-uitm-ir.155252022-11-23T01:56:37Z Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris 2002 Idris, Mukram Technique and materials Outside the buildings, the life of paint film is usually thought to have ended when it is faded, dirty, chipped or scratched. This predicament almost found at numerous buildings in Malaysia and as a study case, several buildings in campus UiTM. This problem can cause divan look where the facade of that building is worst and most terrible. This situation ought to come across and try to dodge by many ways either supervise the quality of work or follow the sequence of work in painting. The type of paint chosen may be not suitable for apply to that surface and the usage of equipment may be not practical or standardised. This dissertation would focus on painting and repainting work, whish will refer to study case that focus the following: □ Identifying source of paint defect. □ Identifying problems in painting process in the selection of material, workmanship and supervision. □ Identifying solution in assuming quality painting by preceding and guideline proposal. □ Determining the best paintwork, technique and technology. In actual phenomena, all factors related to improve painting work will come out in particular by refer to study case, inspection and observation for each selected building in UiTM campus will be done base on object of study. Here, every single feature and problem is defined by overall inspection to the building The result of analysis will come out with conclusion and recommendation. Substrate must be suitably sound for painting and properly prepared. The appropriate paint system must be specified, it must be applied following manufacturer’s recommendations and under suitable conditions. UiTM Maintenance Department must administer all the contractors’ work to make certain improvement in paint quality and to ensure that the facade of building can be more energetic for a longer time without deficiency. 2002 Thesis https://ir.uitm.edu.my/id/eprint/15525/ https://ir.uitm.edu.my/id/eprint/15525/1/TD_MUKRAM%20IDRIS%20AP%2002_5.PDF text en public other degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Mahmood, Mahayudin
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Mahmood, Mahayudin
topic Technique and materials
spellingShingle Technique and materials
Idris, Mukram
Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris
description Outside the buildings, the life of paint film is usually thought to have ended when it is faded, dirty, chipped or scratched. This predicament almost found at numerous buildings in Malaysia and as a study case, several buildings in campus UiTM. This problem can cause divan look where the facade of that building is worst and most terrible. This situation ought to come across and try to dodge by many ways either supervise the quality of work or follow the sequence of work in painting. The type of paint chosen may be not suitable for apply to that surface and the usage of equipment may be not practical or standardised. This dissertation would focus on painting and repainting work, whish will refer to study case that focus the following: □ Identifying source of paint defect. □ Identifying problems in painting process in the selection of material, workmanship and supervision. □ Identifying solution in assuming quality painting by preceding and guideline proposal. □ Determining the best paintwork, technique and technology. In actual phenomena, all factors related to improve painting work will come out in particular by refer to study case, inspection and observation for each selected building in UiTM campus will be done base on object of study. Here, every single feature and problem is defined by overall inspection to the building The result of analysis will come out with conclusion and recommendation. Substrate must be suitably sound for painting and properly prepared. The appropriate paint system must be specified, it must be applied following manufacturer’s recommendations and under suitable conditions. UiTM Maintenance Department must administer all the contractors’ work to make certain improvement in paint quality and to ensure that the facade of building can be more energetic for a longer time without deficiency.
format Thesis
qualification_name other
qualification_level Bachelor degree
author Idris, Mukram
author_facet Idris, Mukram
author_sort Idris, Mukram
title Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris
title_short Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris
title_full Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris
title_fullStr Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris
title_full_unstemmed Analysis the using of paint on external wall (case study: buildings in campus UiTM, Shah Alam) / Mukram Idris
title_sort analysis the using of paint on external wall (case study: buildings in campus uitm, shah alam) / mukram idris
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2002
url https://ir.uitm.edu.my/id/eprint/15525/1/TD_MUKRAM%20IDRIS%20AP%2002_5.PDF
_version_ 1783733415252590592