Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin
The purpose of this research project is to understand and propose solutions to the process of manufacturing of wind turbine by resolving the instantaneous high demand issue faced by the company. The research project focuses on the production planning that the company should employ and decide whether...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/52222/1/52222.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.52222 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.522222021-11-12T01:50:33Z Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin 2012 Baharudin, Indera Shaiful Mechanics applied to machinery. Dynamics Machine design and drawing Hydraulic machinery The purpose of this research project is to understand and propose solutions to the process of manufacturing of wind turbine by resolving the instantaneous high demand issue faced by the company. The research project focuses on the production planning that the company should employ and decide whether it is feasible at all to take on the new demand and the cost savings if the company involves outsourcing some of the components to local vendors/suppliers. By studying and evaluating the current facility and resources of the company, the research is able to analyze factors contributing to the current total cost, which are the production, inventory and man-hour (regular and overtime) costs. By introducing a set of formulation to represent the objective of reducing cost and its bounded constraints, Linear Programming (LP) method was utilized in coming up with the optimized production planning. The results shows that the cost for the total manufacturing amounting to RM 14,163,700.00 while an option of outsourcing will result in savings of RM218,100.00 for the manufacturing of the 200 units within the duration of 24 months. The issue of outsourcing motive, risk and ways to mitigate them are discussed extensively in the discussion section, suggesting that the company should take extra precaution and build closer relationship with multiple suppliers to instigate trust and healthy working environment. This whole research is about finding the optimal solution, if the company decides to start the project, and maximize profit to satisfy stakeholders involved. 2012 Thesis https://ir.uitm.edu.my/id/eprint/52222/ https://ir.uitm.edu.my/id/eprint/52222/1/52222.pdf text en public masters Universiti Teknologi MARA Faculty of Mechanical Engineering Omar, Abdul Rahman (Prof. Ir. Dr. Hj.) |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
advisor |
Omar, Abdul Rahman (Prof. Ir. Dr. Hj.) |
topic |
Mechanics applied to machinery Dynamics Machine design and drawing Hydraulic machinery |
spellingShingle |
Mechanics applied to machinery Dynamics Machine design and drawing Hydraulic machinery Baharudin, Indera Shaiful Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin |
description |
The purpose of this research project is to understand and propose solutions to the process of manufacturing of wind turbine by resolving the instantaneous high demand issue faced by the company. The research project focuses on the production planning that the company should employ and decide whether it is feasible at all to take on the new demand and the cost savings if the company involves outsourcing some of the components to local vendors/suppliers. By studying and evaluating the current facility and resources of the company, the research is able to analyze factors contributing to the current total cost, which are the production, inventory and man-hour (regular and overtime) costs. By introducing a set of formulation to represent the objective of reducing cost and its bounded constraints, Linear Programming (LP) method was utilized in coming up with the optimized production planning. The results shows that the cost for the total manufacturing amounting to RM 14,163,700.00 while an option of outsourcing will result in savings of RM218,100.00 for the manufacturing of the 200 units within the duration of 24 months. The issue of outsourcing motive, risk and ways to mitigate them are discussed extensively in the discussion section, suggesting that the company should take extra precaution and build closer relationship with multiple suppliers to instigate trust and healthy working environment. This whole research is about finding the optimal solution, if the company decides to start the project, and maximize profit to satisfy stakeholders involved. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Baharudin, Indera Shaiful |
author_facet |
Baharudin, Indera Shaiful |
author_sort |
Baharudin, Indera Shaiful |
title |
Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin |
title_short |
Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin |
title_full |
Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin |
title_fullStr |
Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin |
title_full_unstemmed |
Aggregate production planning with outsourcing for wind turbine manufacturing process / Indera Shaiful Baharudin |
title_sort |
aggregate production planning with outsourcing for wind turbine manufacturing process / indera shaiful baharudin |
granting_institution |
Universiti Teknologi MARA |
granting_department |
Faculty of Mechanical Engineering |
publishDate |
2012 |
url |
https://ir.uitm.edu.my/id/eprint/52222/1/52222.pdf |
_version_ |
1783734849370062848 |