Lack of awareness on the approval requirement for house extension / Jamilah Osman
The main issue of this study is that many residents renovate their houses without prior approval. Majlis Perbandaran Petaling Jaya (MPPJ) as the Local Authority of this area must control the renovation work as to ensure that the work is in accordance with UBBL. MPPJ also concerned with the great num...
Saved in:
Main Author: | Osman, Jamilah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61710/1/61710.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Problem associated with derelict shop houses in Kuala Lumpur / Haliza Ab. Karim
by: Ab. Karim, Haliza
Published: (2006) -
House buyer knowledge on building defect and their rights / Nursyahadatul Aisyah Abd Karim
by: Abd Karim, Nursyahadatul Aisyah
Published: (2021) -
Crack detection and characterization of polymer mixed concrete / Mohd Noor Omar
by: Omar, Mohd Noor
Published: (2005) -
Study of the defect in pre-cast building / Marhamah Muhamad
by: Muhamad, Marhamah
Published: (2004) -
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010)