Design of pulley system for transferring the oil samples from ground floor to 3rd floor at company in Kapar Klang / Mohamad Ridhwan Mohamad Yunos
In the oil industry, for example, the wasting time has a detrimental impact on the company's production. At Sumber Petroleum Cemerlang Sdn. Bhd. (SPC) the process of transferring oil samples to the Quality Control (QC) lab costs a lot of time wasted by using manpower instead of using a proper m...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/67843/1/67843.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|