The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the proble...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Online Access: | https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.71294 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.712942023-12-10T10:42:34Z The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar 2014 Ahmad Azhar, Muhamad Hafiz This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the problems that are purported to solve. The objective is specified with an appropriate research method to achieve them .Chapter 2 are compilation of literature review. This chapter with the overview the common roles of contractor, preparing to start the contract and classification of contractor. In addition, this chapter also tell about the general information of defect liability period, process of defect liability period, case of defect liability period in Malaysia, and term and condition of defect liability period. 2014 Thesis https://ir.uitm.edu.my/id/eprint/71294/ https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Mahmood, Mahayudin |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
advisor |
Mahmood, Mahayudin |
description |
This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the problems that are purported to solve. The objective is specified with an appropriate research method to achieve them .Chapter 2 are compilation of literature review. This chapter with the overview the common roles of contractor, preparing to start the contract and classification of contractor. In addition, this chapter also tell about the general information of defect liability period, process of defect liability period, case of defect liability period in Malaysia, and term and condition of defect liability period. |
format |
Thesis |
qualification_level |
Bachelor degree |
author |
Ahmad Azhar, Muhamad Hafiz |
spellingShingle |
Ahmad Azhar, Muhamad Hafiz The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar |
author_facet |
Ahmad Azhar, Muhamad Hafiz |
author_sort |
Ahmad Azhar, Muhamad Hafiz |
title |
The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar |
title_short |
The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar |
title_full |
The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar |
title_fullStr |
The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar |
title_full_unstemmed |
The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar |
title_sort |
obligation of contractor during defect liability period / muhamad hafiz ahmad azhar |
granting_institution |
Universiti Teknologi MARA (UiTM) |
granting_department |
Faculty of Architecture, Planning and Surveying |
publishDate |
2014 |
url |
https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF |
_version_ |
1794191858083037184 |