The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the proble...
Saved in:
Main Author: | Ahmad Azhar, Muhamad Hafiz |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Online Access: | https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006) -
The study on problems during defects liability period [DLP] / Rosli Abu Huraya
by: Abu Huraya, Rosli
Published: (2009)