The study on problems during defects liability period [DLP] / Rosli Abu Huraya
Defects Liability Period (DLP) is wells know building terminology in construction industry. At this point the performance of the building is measured in many aspects. In housing construction industry, meaning this is a time where homebuyer will get peace of mine on their property or headache after d...
Saved in:
Main Author: | Abu Huraya, Rosli |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/74094/1/74094.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
A study on the defects in school buildings (inner and coastal areas) / Nur Syahiran Abu Bakar
by: Abu Bakar, Nur Syahiran
Published: (2008) -
Study of the defect in pre-cast building / Marhamah Muhamad
by: Muhamad, Marhamah
Published: (2004) -
Defects study in high learning institution / Mohammad Radzi Muhammad
by: Muhammad, Mohammad Radzi
Published: (2008) -
Building defects and remedies for special building (Seaport) / Noorzalia Yamin
by: Yamin, Noorzalia
Published: (2008)