Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/84816/1/84816.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.84816 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.848162024-03-26T02:37:53Z Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi 2010 Abdullah Azmi, Musafri Electric power distribution. Electric power transmission This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. 2010 Thesis https://ir.uitm.edu.my/id/eprint/84816/ https://ir.uitm.edu.my/id/eprint/84816/1/84816.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Electrical Engineering Nik Ismail, Nik Fasdi |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
advisor |
Nik Ismail, Nik Fasdi |
topic |
Electric power distribution Electric power transmission |
spellingShingle |
Electric power distribution Electric power transmission Abdullah Azmi, Musafri Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi |
description |
This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. |
format |
Thesis |
qualification_level |
Bachelor degree |
author |
Abdullah Azmi, Musafri |
author_facet |
Abdullah Azmi, Musafri |
author_sort |
Abdullah Azmi, Musafri |
title |
Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi |
title_short |
Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi |
title_full |
Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi |
title_fullStr |
Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi |
title_full_unstemmed |
Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi |
title_sort |
overcurrent and earth fault relay setting and coordination using pss-adept / musafri abdullah azmi |
granting_institution |
Universiti Teknologi MARA (UiTM) |
granting_department |
Faculty of Electrical Engineering |
publishDate |
2010 |
url |
https://ir.uitm.edu.my/id/eprint/84816/1/84816.pdf |
_version_ |
1804889738446897152 |