The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar
Building Information Modelling (BIM) is defined as three dimensions (3D) technology that can represent an accurate virtual model of a building that will improve the life cycle of a building. BIM can be used for the designing and planning stage, the construction stage and the operation and maintenanc...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/92368/1/92368.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.92368 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.923682024-03-25T04:01:40Z The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar 2023 Mohd Mokhtar, Nafisah TH Building construction Systems of building construction. Industrialized building Architectural engineering. Structural engineering of buildings Building Information Modelling (BIM) is defined as three dimensions (3D) technology that can represent an accurate virtual model of a building that will improve the life cycle of a building. BIM can be used for the designing and planning stage, the construction stage and the operation and maintenance stage. However, as mentioned by previous researchers; BIM used is not fully utilized because mainly BIM is used in the planning and designing stage and followed by the construction stage, while BIM in FM remains limited. This has resulted, the stakeholder does not have the confidence to invest in BIM for managing the operation and maintenance stage of a building. Due to that, this research aims to investigate the level of BIM implementation on Facility Management in KKR2 Tower and to determine benefits of BIM implementation in Facility Management in KKR2 Tower. The research used a qualitative approach by conducting face-to-face interviews with the respondent and supported with secondary data from journals, articles and books to reinforce the information. The finding of the research is based on PWD's management toward the BIM model. 2023 Thesis https://ir.uitm.edu.my/id/eprint/92368/ https://ir.uitm.edu.my/id/eprint/92368/1/92368.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Mohamad, Junainah |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
advisor |
Mohamad, Junainah |
topic |
TH Building construction TH Building construction TH Building construction |
spellingShingle |
TH Building construction TH Building construction TH Building construction Mohd Mokhtar, Nafisah The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar |
description |
Building Information Modelling (BIM) is defined as three dimensions (3D) technology that can represent an accurate virtual model of a building that will improve the life cycle of a building. BIM can be used for the designing and planning stage, the construction stage and the operation and maintenance stage. However, as mentioned by previous researchers; BIM used is not fully utilized because mainly BIM is used in the planning and designing stage and followed by the construction stage, while BIM in FM remains limited. This has resulted, the stakeholder does not have the confidence to invest in BIM for managing the operation and maintenance stage of a building. Due to that, this research aims to investigate the level of BIM implementation on Facility Management in KKR2 Tower and to determine benefits of BIM implementation in Facility Management in KKR2 Tower. The research used a qualitative approach by conducting face-to-face interviews with the respondent and supported with secondary data from journals, articles and books to reinforce the information. The finding of the research is based on PWD's management toward the BIM model. |
format |
Thesis |
qualification_level |
Bachelor degree |
author |
Mohd Mokhtar, Nafisah |
author_facet |
Mohd Mokhtar, Nafisah |
author_sort |
Mohd Mokhtar, Nafisah |
title |
The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar |
title_short |
The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar |
title_full |
The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar |
title_fullStr |
The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar |
title_full_unstemmed |
The level of Building Information Modelling (BIM) implementation in facility management: case study of KKR2 tower / Nafisah Mohd Mokhtar |
title_sort |
level of building information modelling (bim) implementation in facility management: case study of kkr2 tower / nafisah mohd mokhtar |
granting_institution |
Universiti Teknologi MARA (UiTM) |
granting_department |
Faculty of Architecture, Planning and Surveying |
publishDate |
2023 |
url |
https://ir.uitm.edu.my/id/eprint/92368/1/92368.pdf |
_version_ |
1804889854274699264 |