Modelling success factors influencing industrialized building system project performance using dematel
Industrialized Building System (IBS) is the term to represent the prefabrication concept in the Malaysian construction industry that uses standardized building components mass produced in a factory or on the site. Adoption of IBS in Malaysia in still very low whereby only 10% of total awarded projec...
Saved in:
Main Author: | Yusmin, Jaffar |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/35289/1/14.Modelling%20success%20factors%20influencing%20industrialized%20building%20system%20project%20performance%20using%20dematel.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The impacts of the university policies during covid-19 pandemic towards academic operation, financial, facilities and staff operation in universiti malaysia pahang: A dematel based model
by: Azrizulazmi, Bustan
Published: (2022) -
Factors affecting design & build construction project success in Manila, Philippines
by: Yip, Hock Seng
Published: (2019) -
Renewable energy project success in malaysia: the influence of stakeholder engagement indicators with the moderating effect of renewable energy policy implementation
by: Zarith Sufia, Azlan
Published: (2022) -
The Critical Success Factors Of TQM Implementation In Malaysian SMES
by: Roozbahani, Mahsa
Published: (2011) -
Micro antecedents of absorptive capacity: Implications of social context in joint project teams in Nigerian Upstream oil industry
by: Oluwaseyi Ojo, Adedapo
Published: (2014)