Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System
Awareness on the environment and significant benefit to the customer has lead to the growth of Thermal Energy Storage (TES) application in Malaysia. Most of them are implemented in medium to large chilled water manufacturing facility that cooled multiple buildings in a widespread area or integrat...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2002
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/12096/1/FK_2002_62.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-upm-ir.12096 |
---|---|
record_format |
uketd_dc |
spelling |
my-upm-ir.120962024-06-28T03:31:23Z Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System 2002-11 Abd Salam, Amir ihsan Awareness on the environment and significant benefit to the customer has lead to the growth of Thermal Energy Storage (TES) application in Malaysia. Most of them are implemented in medium to large chilled water manufacturing facility that cooled multiple buildings in a widespread area or integrated in a District Cooling System (DCS). For encapsulated ice method, the difference in the amount of ice supplied to supplement the chilled water generated during peak hours plays major role in ascertaining the result of electricity bill savings and therefore, payback period. Based on actual implementation in Cyberjaya, Selangor, a simple simulation program of TES integrated DCS is created to study the impact on the electricity bill savings,conventional system. Varying the percentage of ice supply, application to cooling capacity of 500 RT, 1000 RT, 1500 RT with and without base load, on different tariff rates are calculated. It shows that integration of smallest percentage of TES is most feasible in terms of payback period and electricity consumption. However, the amount of savings is small. As the ice making process operates at lower temperature, there is also penalty on energy consumption. On tariff imposed, the acceptable range for base load and percentage of ice supply that is feasible are identified while most of the rates in no base condition qualify to entitlement of payback period under five years. The parameters whereby TES integrated DCS are not advisable are also acknowledged. Heat storage 2002-11 Thesis http://psasir.upm.edu.my/id/eprint/12096/ http://psasir.upm.edu.my/id/eprint/12096/1/FK_2002_62.pdf text en public masters Universiti Putra Malaysia Heat storage Faculty of Engineering Megat Ahmad, Megat Hamdan English |
institution |
Universiti Putra Malaysia |
collection |
PSAS Institutional Repository |
language |
English English |
advisor |
Megat Ahmad, Megat Hamdan |
topic |
Heat storage |
spellingShingle |
Heat storage Abd Salam, Amir ihsan Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System |
description |
Awareness on the environment and significant benefit to the customer has
lead to the growth of Thermal Energy Storage (TES) application in Malaysia. Most of
them are implemented in medium to large chilled water manufacturing facility that
cooled multiple buildings in a widespread area or integrated in a District Cooling
System (DCS). For encapsulated ice method, the difference in the amount of ice
supplied to supplement the chilled water generated during peak hours plays major
role in ascertaining the result of electricity bill savings and therefore, payback period.
Based on actual implementation in Cyberjaya, Selangor, a simple simulation program
of TES integrated DCS is created to study the impact on the electricity bill savings,conventional system. Varying the percentage of ice supply, application to cooling
capacity of 500 RT, 1000 RT, 1500 RT with and without base load, on different tariff
rates are calculated. It shows that integration of smallest percentage of TES is most
feasible in terms of payback period and electricity consumption. However, the
amount of savings is small. As the ice making process operates at lower temperature,
there is also penalty on energy consumption. On tariff imposed, the acceptable range
for base load and percentage of ice supply that is feasible are identified while most of
the rates in no base condition qualify to entitlement of payback period under five
years. The parameters whereby TES integrated DCS are not advisable are also
acknowledged. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Abd Salam, Amir ihsan |
author_facet |
Abd Salam, Amir ihsan |
author_sort |
Abd Salam, Amir ihsan |
title |
Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System |
title_short |
Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System |
title_full |
Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System |
title_fullStr |
Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System |
title_full_unstemmed |
Development Of Simulation Program For Thermal Energy Storage Integrated District Cooling System |
title_sort |
development of simulation program for thermal energy storage integrated district cooling system |
granting_institution |
Universiti Putra Malaysia |
granting_department |
Faculty of Engineering |
publishDate |
2002 |
url |
http://psasir.upm.edu.my/id/eprint/12096/1/FK_2002_62.pdf |
_version_ |
1804888679196393472 |