Development of early order stage cost estimation models for sheet metal component
Timely submission of an accurate cost estimate is vital to the survival of manufacturing support group companies. Late submission of quotation and uncompetitive cost estimate result in lost of customers while an underestimate quotation may reduce company’s profit and usually leads to problems later...
Saved in:
Main Author: | Mohamed Rasin, Mohamad Zaihirain |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/40937/1/FK%202010%2060R.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of genetic algorithm on cable cost optimization /
by: Lee, Yan Wuu
Published: (2008) -
A competitive analysis on the metal packaging coatings industry in Malaysia /
by: Yang, Mee Lin
Published: (2000) -
Scheduling dynamic cellular manufacturing systems in the presence of cost uncertainty using heuristic method
by: Delgoshaei, Aidin
Published: (2016) -
Combined method for die compensation in sheet metal forming
by: Muhammad Marhaban, Agus Dwi Anggono
Published: (2014) -
Characterisation of self-cleaning coating on aluminium fin /
by: Rasyidah Abd Rahim
Published: (2016)