Framework for improving clash management process for the construction management team using industrialized building product
The construction industry continually facing problems in its projects. The clashes that occur during construction phase consider one of the major problems faced by the construction project. Furthermore, controlling the construction clashes consider a crucial need to decrease the waste of time and...
Saved in:
Main Author: | Jarullah, Mustafa Fawwaz |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/90027/1/FRSB%202020%2011%20ir.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The potential of Building Information Modelling (BIM) in improving project time management in the Malaysian construction industry /
by: Mahmoud Khaalleefah Abdulhamid Alabeedi
Published: (2020) -
Integration in construction project teams and its effects on project performance /
by: Nazira Lokman
Published: (2016) -
Lack of awareness among contractor in project management: delay construction / Suria Yaacob
by: Yaacob, Suria
Published: (2006) -
Determining the relationship between cost of control and project management success in building construction /
by: Al-Tmeemy, Samiaah M. Hassen
Published: (2011) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
by: Lim, Cheong Seng
Published: (2001)