A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of st...
Saved in:
Main Author: | Ridha, Ahmed Dhya’a M. |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comparison between predicted and actual ground settlement improved using stone columns
by: Chee, Khong Siong
Published: (2015) -
Comparison of predicted settlement behaviour to the field measurement of stone column improved ground
by: Raman, Selvem
Published: (2006) -
Behaviour of stone columns supported embankment on soft soil /
by: Abdalwahab, Maryam M. Gaber -
Performance Of Fire-Damaged Reinforced Concrete Rectangular Columns Retrofitted With Fiber Reinforced Polymer Composites
by: Moghtadernejad, Nima
Published: (2014) -
Computational Strategy For Rehabilitation Of Reinforced Concrete Framed Structure Using Fibre Reinforced Polymer Confinement Of Columns
by: Seyedasaei, Seyedmohsen
Published: (2014)