P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor
The objective of this study is to compare the performance of sequencing batch biofilm reactor (SBBR) and sequencing batch reactor (SBR) in treating p-chlorophenol (PCP) and nitrogen. The SBR and SBBR systems were operated in five sequential periods, namely FILL, REACT (aerobic and anoxic), SETTLE, D...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.usm.my/43420/1/MUNA%20MASTURA%20%20MOHAMAD.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-usm-ep.43420 |
---|---|
record_format |
uketd_dc |
spelling |
my-usm-ep.434202019-04-12T05:26:26Z P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor 2011-12 Mohamad, Muna Mastura QD1-999 Chemistry The objective of this study is to compare the performance of sequencing batch biofilm reactor (SBBR) and sequencing batch reactor (SBR) in treating p-chlorophenol (PCP) and nitrogen. The SBR and SBBR systems were operated in five sequential periods, namely FILL, REACT (aerobic and anoxic), SETTLE, DRAW and IDLE in the time ratio of 2:12:1:1:8 for a cycle time of 24 h. The SBR was used as the control reactor (RC) while the other two SBBRs, RB1 and RB2, were operated with 3 and 5% (v/v) of polyurethane foam cubes as the carrier materials, respectively. 2011-12 Thesis http://eprints.usm.my/43420/ http://eprints.usm.my/43420/1/MUNA%20MASTURA%20%20MOHAMAD.pdf application/pdf en public masters Universiti Sains Malaysia Pusat Pengajian Sains Kimia |
institution |
Universiti Sains Malaysia |
collection |
USM Institutional Repository |
language |
English |
topic |
QD1-999 Chemistry |
spellingShingle |
QD1-999 Chemistry Mohamad, Muna Mastura P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
description |
The objective of this study is to compare the performance of sequencing batch biofilm reactor (SBBR) and sequencing batch reactor (SBR) in treating p-chlorophenol (PCP) and nitrogen. The SBR and SBBR systems were operated in five sequential periods, namely FILL, REACT (aerobic and anoxic), SETTLE, DRAW and IDLE in the time ratio of 2:12:1:1:8 for a cycle time of 24 h. The SBR was used as the control reactor (RC) while the other two SBBRs, RB1 and RB2, were operated with 3 and 5% (v/v) of polyurethane foam cubes as the carrier materials, respectively. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Mohamad, Muna Mastura |
author_facet |
Mohamad, Muna Mastura |
author_sort |
Mohamad, Muna Mastura |
title |
P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
title_short |
P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
title_full |
P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
title_fullStr |
P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
title_full_unstemmed |
P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
title_sort |
p-chlorophenol removal in sequencing batch biofilm reactor |
granting_institution |
Universiti Sains Malaysia |
granting_department |
Pusat Pengajian Sains Kimia |
publishDate |
2011 |
url |
http://eprints.usm.my/43420/1/MUNA%20MASTURA%20%20MOHAMAD.pdf |
_version_ |
1747821210519994368 |