Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
Nowadays, many manufacturers are now critically evaluating their processes to determine their effectiveness in bringing maximum value to customers where the techniques can give greatly minimize delays, reduce costs, and improve quality. Lean manufacturing is more than a set of tools and techniques a...
Saved in:
Main Author: | Sabah, Mariati |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/20536/1/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf http://eprints.utem.edu.my/id/eprint/20536/2/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Changeover time improvement of pressure die casting machine by single minute exchange of die implementation
by: Embok Resa, Mohammad Afif
Published: (2020) -
Kanban System And Its Impact On Inventory Control In The Manufacturing Sector In Malaysia
by: Velayuthan, Sugumar
Published: (2009) -
Kanban System And Its Impact On Inventory Control In The Manufacturing Sector In Malaysia
by: Velayuthan, Sugumar
Published: (2009) -
Defect detection in high pressure die casting product using image processing technology
by: Wahab, Md Saidin
Published: (2003) -
Analysis of mechanical properties and microstructure of multiple die cavity products produced in vertical and horizontal arrangement by gravity die casting
by: Elfallah, Saleh S Saleh
Published: (2012)