Improvement of change glue schedule down time at lid attachment process for semiconductor devices
This research report presents the work done on the improvement of change glue schedule down time at lid attachment process for semiconductor devices. Lid attachment is the end of line process for Plastic Dual Small Outline Flat (PDSOF) package which is one of the semiconductor devices. The process...
Saved in:
Main Author: | Abd Rahman, Rozeana |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/23785/1/Improvement%20Of%20Change%20Glue%20Schedule%20Down%20Time%20At%20Lid%20Attachment%20Process%20For%20Semiconductor%20Devices%20-%20Rozeana%20Abd%20Rahman%20-%2024%20Pages.pdf http://eprints.utem.edu.my/id/eprint/23785/2/Improvement%20of%20change%20glue%20schedule%20down%20time%20at%20lid%20attachment%20process%20for%20semiconductor%20devices.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integration of smed and triz in improving productivity at semiconductor industry
by: Kumaresan, Kartik Sreedharaan
Published: (2011) -
Lean manufacturing and OEE optimization of semiconductor industry through scheduled downtime reduction at testing process
by: Ho, Chee Huay
Published: (2016) -
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004) -
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011) -
Productivity improvement using overall equipment efficiency in semiconductor industry
by: Chinnappan, Ushananthini
Published: (2021)