Competency-driven benefits realization model for minimization of post-contract transaction costs in design-build (d&b) delivery systems
The construction industry has been struggling with the issue of inconsistent performance with respect to cost of projects, completion time and the delivery of a quality product. In an attempt to address this issue the Design-Build (D&B) project delivery system was initiated primarily to overcome...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/290/1/24p%20ABDULAZEEZ%20UMAR%20RAJI.pdf http://eprints.uthm.edu.my/290/2/ABDULAZEEZ%20UMAR%20RAJI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/290/3/ABDULAZEEZ%20UMAR%20RAJI%20WATERMARK.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|