Determining accuracy of bill of materials for a surface mount technology machine using solidworks software
Bill of Materials (BOM) is a simple list of the contents of subassembly or material to assembly a complete product. The BOM mainly use for the Material Requirement Planning (MRP) to determine the inventory level should be ke!ep for production. Costing is done base on the BOM to set the total cost...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3782/1/24p%20CHONG%20SIAW%20HUA.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Bill of Materials (BOM) is a simple list of the contents of subassembly or
material to assembly a complete product. The BOM mainly use for the Material
Requirement Planning (MRP) to determine the inventory level should be ke!ep for
production. Costing is done base on the BOM to set the total cost for the product. BOM
is part of the important list for the production to determine what part, quantity part to be
used and as reference with the engineering drawing to do the assembly of the product or
machine. In this project, an investigation has been done in a contract manufacturing
company which received BOM from Original Equipment Manufacturer. In order to
verify the BOM, all the engineering drawing been modeling in 3d format. Process of
assembly of the part been done by using Solidworks software. Auto generated BOM
from the software has been compared with the Original provide by the OEM. Analysis to
determine accuracy of the BOM has been done and Discussion on the reason of the
discrepancy has been identified. However, some of the part not been verified as the
restriction of the Company Policy |
---|