Internal auditors readiness in audit 4.0 project management
This study was conducted to examine the level of readiness of the Internal Auditors in the development of Audit 4.0 in the Project Management audit. Currently, the digitalization has grown rapidly in the activities in each Project Management process. The use of automation system has been recognized...
Saved in:
Main Author: | Md. Rahin, Nurdalila |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/102155/1/NurdalilaMdRahinMSKA2021.pdf.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Adoption of construction industry 4.0 among small and medium sized contractor in Malaysia
by: Shaharuddin, Ahmad Bukhori
Published: (2020) -
Strategi pemprosesan GPS berkejituan tinggi menggunakan perisian bernese versi 4.0 : kes kajian di Malaysia
by: Daud, Mohd. Effendi
Published: (1999) -
A study on decision criteria for assessing construction readiness of highway projects
by: Nur Afiqah, Mohd Radzi
Published: (2021) -
The challenges in international construction project with regard to safety compliance and cross cultural management
by: Mohd. Radzuan, Nor Amin
Published: (2008) -
Improving materials management on construction projects
by: Kasim, Narimah
Published: (2008)