Apartments ownership and maintenance
In Malaysia, apart from the low-rise development, the high rise apartment buildings are also in demand. However, before the construction of the apartment can begin, the developer will need to apply and obtain approval for the strata title. This process is lengthy and the developer ignores the requir...
Saved in:
Main Author: | Ahmadnia, Behzad |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11065/4/BehzadAhmadniaMFKA2010.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of BIM in sustainability analysis
by: Golzarpoor, Hamed
Published: (2010) -
Road maintenance management system : a case study at public work department
by: Mohamed, Nurul Wahida
Published: (2010) -
Efficiency in construction process
by: Taib, Tahrina
Published: (2010) -
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010) -
Voidable and void construction contracts
by: Yow, Kah Lun
Published: (2006)