Techniques for valuation of variation works
Construction industry in Malaysia is typically considered as fragmented. Lack of integration tends to incur additional costs from rework. The variations arise in the contract need to be valued accordingly depend upon the nature of the variations. The valuation of variations has long been recognized...
Saved in:
Main Author: | Ismail, Zulkhairi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11238/1/ZulkhairiIsmailMFKA2010.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quantifying depreciation in plant and machinery valuation
by: Sahray, Kholim
Published: (2009) -
The use of contingent valuation method (willingness to pay) in an environmental assessment of a dredging project
by: Goh, Jessie Grace Poh Ling
Published: (2009) -
Soil moisture variation due to grass water uptake in shallow slope
by: Ismail, Siti Saidatul Azween
Published: (2015) -
Coupling effect of suction variation on riverbank stability
by: Foroutan, Maziar
Published: (2013) -
Variation orders in transmission projects of Tenaga Nasional Berhad
by: Abdul Kudus, Baharuddin
Published: (2005)