A comparative study of construction project delays in Johor and Sabah region
A timely completion of construction project is a major criterion of project success. Failure to complete the project on time will ultimately results in delay. The need to control the causes of delays during the construction process comes out when the number of delay project has been increase from ti...
Saved in:
Main Author: | Safri, Dayang Sabriah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/12698/1/DayangSabriahSafriMFKA2009.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A novel family of group chain acceptance sampling plans (GChSP) using Minimum Angle Method (MAM)
by: Mohd Azri, Pawan Teh
Published: (2022) -
The Influence Of Csr Practices On
Csr-Hr Capabilities And
Organizational Performance Among
Malaysian Public Listed Companies
by: Halim, Muhammad Nazri Abdul
Published: (2018) -
Assessment of safety level in performing building maintenance work in Malaysia
by: Ismail, Ilyani
Published: (2006) -
The essential aspects of fire safety management in high-rise buildings
by: Tharmarajan, Prashant
Published: (2007) -
Formulation of project management models and strategies for design and build projects in Malaysia
by: Siong, Andy Teck Kwong
Published: (2009)