Measure of damages for defective building work
Saved in:
Main Author: | Wong, Bi Xia |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Defects and improving the maintainability of buildings at the advance technical training centres
by: Raman, Rajandran Suppiah
Published: (2011) -
Recovery of damages beyond the limit of unenforceable liquidated damages clause
by: Zainudin, Zulhilmi
Published: (2017) -
The Impact Of Latent Defects On The Public
Buildings In Malaysia
by: Talib, Roslan
Published: (2022)