Time overrun in construction projects at Malaysian Palm Oil Board
Saved in:
Main Author: | Ibrahim, Abd. Jalil |
---|---|
Format: | Thesis |
Published: |
2012
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Time and cost overrun of construction projects in Malaysia
by: Hassaniavarzaman, Mehdi
Published: (2013) -
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014) -
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
by: Lim, Cheong Seng
Published: (2001) -
Improvement measures of cost overruns in residential construction project in Malaysia
by: Rahim, Nur Syafika Artika
Published: (2020)