Time measurement for improvement for construction using deming theory
Saved in:
Main Author: | Kabirifar, Kamyar |
---|---|
Format: | Thesis |
Published: |
2012
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Sumbangan Dr. W. E. Deming
Terhadap Corak Pengurusan Kualiti
Syarikat-Syarikat Multinasional Di Malaysia
by: Chua, Chae Hiang
Published: (1998) -
Lead time in construction process
by: Ishak, Nurul Arafah
Published: (2012) -
Measurement and improvement of organisational performance using model of performance analysis
by: Mohammad, Ahmad Khir
Published: (2014) -
Developing a model to predict time delay in road construction projects using bayesian networks
by: Mohammad, Almohammad
Published: (2020) -
Improvement measures of cost overruns in residential construction project in Malaysia
by: Rahim, Nur Syafika Artika
Published: (2020)