Time and cost overrun of construction projects in Malaysia
Time and cost overruns is one of most important problems at construction management field. Delays can be minimized only when their causes are recognized.Cost management is a main stem of construction management and the most important tool sought by contractors to maintain profit which is the main go...
Saved in:
Main Author: | Hassaniavarzaman, Mehdi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/34701/1/MehdiHassaniavarzamanMFKA2013.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Time overrun in construction projects at Malaysian Palm Oil Board
by: Ibrahim, Abd. Jalil
Published: (2012) -
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014) -
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
Improvement measures of cost overruns in residential construction project in Malaysia
by: Rahim, Nur Syafika Artika
Published: (2020) -
A study on the cost overruns in Goverment Hospital Construction Project in Malaysia /
by: Jagathisvaran, Ramachandran
Published: (2022)