The behaviour of pinned beam-to-column connection in precast concrete
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2005
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.34999 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.349992013-10-17T01:28:57Z The behaviour of pinned beam-to-column connection in precast concrete 2005-00 Lee, Ming Kai Unspecified 2005-00 Thesis http://eprints.utm.my/id/eprint/34999/ masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
Unspecified |
spellingShingle |
Unspecified Lee, Ming Kai The behaviour of pinned beam-to-column connection in precast concrete |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Lee, Ming Kai |
author_facet |
Lee, Ming Kai |
author_sort |
Lee, Ming Kai |
title |
The behaviour of pinned beam-to-column connection in precast concrete |
title_short |
The behaviour of pinned beam-to-column connection in precast concrete |
title_full |
The behaviour of pinned beam-to-column connection in precast concrete |
title_fullStr |
The behaviour of pinned beam-to-column connection in precast concrete |
title_full_unstemmed |
The behaviour of pinned beam-to-column connection in precast concrete |
title_sort |
behaviour of pinned beam-to-column connection in precast concrete |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Civil Engineering |
granting_department |
Faculty of Civil Engineering |
publishDate |
2005 |
_version_ |
1747816306753667072 |