Simulation of industrialised building system components production
The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel...
Saved in:
Main Author: | Ng, Soon Ching |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Productivity rate for industrialised building system project
by: Raja Abd. Assis, Raja Puteri Marlina
Published: (2020) -
The adoption of building information modelling in industrialised building system
by: Ahmad Bajuri, Fatin Afiqah
Published: (2017) -
Quality and satisfaction of house owners for industrialised building system and conventional building system
by: Mohammad, Hairuddin
Published: (2009) -
Finite element analysis of rapid footing for industrialised building system
by: Hashim, Nur Anira Asyikin
Published: (2014) -
Behaviour of industrialised building system model in fluid-solid interaction
by: Farahmandpour, Omolbanin
Published: (2016)