Analysis of industrialized building system block work with ETABS
Recently the application of IBS components in construction of many civil engineering projects is accelerating due to its simplicity for fabrication and saving in cost and time of construction process. This study is a software analysis of wall block work where the wall is non-load bearing infill. Hen...
Saved in:
Main Author: | Rahmat, Maziar Ghabel |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/36252/1/MaziarGhabelRahmatMFKA2013.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Scheduling on transportation for industrialized building systems
by: Foong, Kok Li
Published: (2006) -
The block properties and structural behaviour of loadbearing interlocking hollow cement block systems manufactured using mobile block machine
by: Kolop, Roslan
Published: (2001) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
Life cycle costing of industrialized building system and conventional building system
by: Ali Naji Al-Attabi, Ali Mohammed
Published: (2014) -
The implementation of Industrialized Building System (IBS) in the perception of contractors / Nur Eirdhina Nor Hashim
by: Nor Hashim, Nur Eirdhina
Published: (2023)