An evaluation of effectiveness of approximate quantity method in estimating construction cost

Cost estimating is one of the important phases in construction. Despite cost estimating is an important process that predicting the actual construction cost, however it is often underrated facet of its effectiveness and accuracy. Clients and architects are not satisfied with the cost advice provided...

Full description

Saved in:
Bibliographic Details
Main Author: Siew, Sik Nguong
Format: Thesis
Published: 2013
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.41776
record_format uketd_dc
spelling my-utm-ep.417762020-07-02T03:04:16Z An evaluation of effectiveness of approximate quantity method in estimating construction cost 2013 Siew, Sik Nguong TH Building construction Cost estimating is one of the important phases in construction. Despite cost estimating is an important process that predicting the actual construction cost, however it is often underrated facet of its effectiveness and accuracy. Clients and architects are not satisfied with the cost advice provided by quantity surveyors. The construction project is often overrun cost because of the ineffectiveness of cost estimate. Hence, the research is carried out to determine the factors that affect the effectiveness of approximate quantity method, to analyse the impacts of ineffectiveness of approximate quantity method and to establish the ways to improve the effectiveness of approximate quantity method. The objectives would be determined through the distribution of questionnaires with quantity surveyors with minimum 5 working experiences in Johor area. The data collected through questionnaire will be analysed with mean, Linear Regression and Kruskal-Wallis Test and the results are discussed in the report. From the results obtained, incomplete specifications, experiences by QS, time for estimating and characteristics of project identified as the most important factors among others. Due to ineffectiveness of approximate quantity method, the construction cost is the first and the most to be affected. However, the respondents suggested that effectiveness of approximate quantity method can be improved by ensuring proper design documentation and sufficient design information. Realistic time frame and experienced QS are also the most recommended strategies to improve the effectiveness of cost estimating. 2013 Thesis http://eprints.utm.my/id/eprint/41776/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85684 masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic TH Building construction
spellingShingle TH Building construction
Siew, Sik Nguong
An evaluation of effectiveness of approximate quantity method in estimating construction cost
description Cost estimating is one of the important phases in construction. Despite cost estimating is an important process that predicting the actual construction cost, however it is often underrated facet of its effectiveness and accuracy. Clients and architects are not satisfied with the cost advice provided by quantity surveyors. The construction project is often overrun cost because of the ineffectiveness of cost estimate. Hence, the research is carried out to determine the factors that affect the effectiveness of approximate quantity method, to analyse the impacts of ineffectiveness of approximate quantity method and to establish the ways to improve the effectiveness of approximate quantity method. The objectives would be determined through the distribution of questionnaires with quantity surveyors with minimum 5 working experiences in Johor area. The data collected through questionnaire will be analysed with mean, Linear Regression and Kruskal-Wallis Test and the results are discussed in the report. From the results obtained, incomplete specifications, experiences by QS, time for estimating and characteristics of project identified as the most important factors among others. Due to ineffectiveness of approximate quantity method, the construction cost is the first and the most to be affected. However, the respondents suggested that effectiveness of approximate quantity method can be improved by ensuring proper design documentation and sufficient design information. Realistic time frame and experienced QS are also the most recommended strategies to improve the effectiveness of cost estimating.
format Thesis
qualification_level Master's degree
author Siew, Sik Nguong
author_facet Siew, Sik Nguong
author_sort Siew, Sik Nguong
title An evaluation of effectiveness of approximate quantity method in estimating construction cost
title_short An evaluation of effectiveness of approximate quantity method in estimating construction cost
title_full An evaluation of effectiveness of approximate quantity method in estimating construction cost
title_fullStr An evaluation of effectiveness of approximate quantity method in estimating construction cost
title_full_unstemmed An evaluation of effectiveness of approximate quantity method in estimating construction cost
title_sort evaluation of effectiveness of approximate quantity method in estimating construction cost
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2013
_version_ 1747816615367409664