Effective preventive maintenance planning procedures for continuously operating power generation equipment and systems
Saved in:
Main Author: | Ali Hassan, Ibrahim Moallim |
---|---|
Format: | Thesis |
Published: |
1995
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Preventive maintenance improvement at epoxy cure operation
by: Harudin , Nolia
Published: (2010) -
Defect detection on electrical power equipment using thermal imaging technology
by: Geoffrey, Ogadimma Asiegbu
Published: (2013) -
Electricity load forecasting for power system planning and operation by using artificial neural network
by: Mohamed, Yakub Hussein
Published: (2022) -
A conceptual design of an alternative method for cutting off standby power consumption for office equipment
by: Tan, Kheng Wee
Published: (2012) -
Hybrid photovoltaic-fuel cell-supercapacitor energy system for power generation in stand-alone operation
by: Mohd. Salleh, Noor Amirah
Published: (2020)