Construction of precast segmental box girder bridge using overhead gantry - a case study
The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existi...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2006
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|