The current practice and problems of contractual arrangement in construction industry
There are risks involved in any type of contract arrangement in any construction project. The most appropriate contract method for the project needed to ensure optimum efficiency in the future. The present tendency that numerous disputes are arising from contracts in the industry is an indication th...
Saved in:
Main Author: | Yow, Soon Keong |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4606/6/YowSoonKeongKPFKA2006.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Organizational talent management initiatives and practices in construction industry
by: Kusni @ Sulikan, Hasliana
Published: (2019) -
Reviewing the current practice of professional fees for civil and structural engineering consultancy services
by: Salleh, Salehin
Published: (2007) -
A case study on the management of UTM new hostel based on design and build arrangement
by: Mohamed, Nurul Hidayati
Published: (2005) -
Effect of base columns arrangement to lateral displacement and shear lag of modified diagrid structures
by: Anuar, Fatin Izzaidah
Published: (2017) -
Exploring the knowledge, attitude and practice of prevention through design among designers in Malaysia construction industry
by: Hamdan, Ahmad Syauqi
Published: (2021)