Simulation of assembly of components for industrialized building system
Industrial Building System (IBS) is the construction method that organized as industrial construction process. This system save construction time and workers, provide better quality control, and enhance the productivity. In other hand, the construction method that offers economization of design will...
محفوظ في:
المؤلف الرئيسي: | Ali Zoubi, Ali Houssein |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/48609/1/AliHousseinAliZoubiMFKA2014.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Life cycle costing of industrialized building system and conventional building system
بواسطة: Ali Naji Al-Attabi, Ali Mohammed
منشور في: (2014) -
Scheduling on transportation for industrialized building systems
بواسطة: Foong, Kok Li
منشور في: (2006) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
بواسطة: Zawawi, Mardhiah
منشور في: (2009) -
The implementation of Industrialized Building System (IBS) in the perception of contractors / Nur Eirdhina Nor Hashim
بواسطة: Nor Hashim, Nur Eirdhina
منشور في: (2023) -
Industrialised building system formation scheduling for public buildings
بواسطة: Tay, Allan Eng Mian
منشور في: (2006)