Simulation of assembly of components for industrialized building system
Industrial Building System (IBS) is the construction method that organized as industrial construction process. This system save construction time and workers, provide better quality control, and enhance the productivity. In other hand, the construction method that offers economization of design will...
Saved in:
主要作者: | Ali Zoubi, Ali Houssein |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/48609/1/AliHousseinAliZoubiMFKA2014.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Life cycle costing of industrialized building system and conventional building system
由: Ali Naji Al-Attabi, Ali Mohammed
出版: (2014) -
Scheduling on transportation for industrialized building systems
由: Foong, Kok Li
出版: (2006) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
由: Zawawi, Mardhiah
出版: (2009) -
The implementation of Industrialized Building System (IBS) in the perception of contractors / Nur Eirdhina Nor Hashim
由: Nor Hashim, Nur Eirdhina
出版: (2023) -
Industrialised building system formation scheduling for public buildings
由: Tay, Allan Eng Mian
出版: (2006)