Optimizing production line of IBS by using simulation model
Even though IBS has the ability to offer intensive production elements, the rapid increasing demands of providing a shelter for every citizen is enforced enhancing the productivity and the delivery time of IBS. That may obtained by improving the production line layout of the manufacture plant, enhan...
Saved in:
Main Author: | Alashwal, Ali Mohammed |
---|---|
Format: | Thesis |
Published: |
2006
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Does IBS implementation affect the construction cost / Muhammad Syahir Soleh
by: Soleh, Muhammad Syahir
Published: (2021) -
Earthquake analysis of IBS for single storey housing
by: Yunus, Siti Radiah
Published: (2007) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
The implementation of Industrialized Building System (IBS) in the perception of contractors / Nur Eirdhina Nor Hashim
by: Nor Hashim, Nur Eirdhina
Published: (2023) -
Element of warranty of IBS structural system for construction industry
by: Sing, Annan Vessinuk
Published: (2013)