Development of common work breakdown structure (WBS) for school project
A lot have been said about delayed school projects. Among the main factors that contribute to the problem are lacking of experience among the contractor, adopting non suitable and non detailed scheduling method for project monitoring. Ministry of Works and The Ministry of Education are two main bodi...
Saved in:
Main Author: | Abdullah, Azhar |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4892/1/AzharAbdullahMFKA2006.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of cost driven work breakdown structure for project monitoring and controlling
by: Mohamad @Harun, Norhamidah
Published: (2015) -
Electrical breakdown and mechanical ageing in dielectric elastomers
by: Shamsul, Zakaria
Published: (2016) -
Productivity rate of roof works for JKR school project scheduling
by: Rijal , Zuraida Zaini
Published: (2010) -
Influence of work team effectiveness on project delivery
by: Amran, Dayang Nur Fatthanah
Published: (2015) -
Contractor performance measurement for public school projects
by: Mohd. Nasir, Siti Rashidah
Published: (2011)