Implementation strategy for industrialised building system
In Malaysia, the implementation of Industrialised Building System (IBS) by using precast concrete elements were introduced since 1966 when the government launched two pilot projects in 1966 which involves the construction of Tuanku Abdul Rahman Flats in Kuala Lumpur and the Rifle Range Road Flats in...
Saved in:
Main Author: | Lim, Pui Chung |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/5058/1/LimPuiChungMFKA2006.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
Industrialised building system formation scheduling for public buildings
by: Tay, Allan Eng Mian
Published: (2006) -
Quality and satisfaction of house owners for industrialised building system and conventional building system
by: Mohammad, Hairuddin
Published: (2009) -
Persepsi pemaju terhadap penggunaan IBS (Industrialised Building System)
by: Ab. Rahim, Nor Hayati
Published: (2009) -
Client perspective towards application of industrialised building system in private construction projetcs
by: Suraji, Norlia Sofa
Published: (2013)