Variation orders in transmission projects of Tenaga Nasional Berhad
The project owner must accept that no construction method or for that matter the project, is free of changes and its subsequently activity of claims. Tenaga Nasional Berhad, in its implementation of capital infrastructure projects for the electrical power industry is not immune to variation orders....
Saved in:
Main Author: | Abdul Kudus, Baharuddin |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/5290/1/BaharuddinAbdulKudusMFKA2005.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Minimizing variation order on construction project due to design change
by: Hamdan, Hazrin
Published: (2012) -
Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
by: Ibrahim, Nor Hayati
Published: (2006) -
The role of building information modelling design application in mitigating the variation order in Jordanian construction industry
by: Ja’far, Al-Diabat Al-Btoosht
Published: (2018) -
Career development of transmission engineers in Tenaga Nasional Berhad /
by: Zanial Md. Nasir
Published: (1996) -
Techniques for valuation of variation works
by: Ismail, Zulkhairi
Published: (2010)