Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan

This research address a problem faced by manufacturing companies that is the problem of production scheduling experiencing disruption. The disruption might be caused by changes of priority, new order, and changes of due date in production scheduling. Therefore, the scheduling have been created becom...

Full description

Saved in:
Bibliographic Details
Main Author: Joesni Ralin, Ayu Bidiawati
Format: Thesis
Language:English
Published: 2004
Subjects:
Online Access:http://eprints.utm.my/id/eprint/5389/1/AyuBidiawatiMFKM2004.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.5389
record_format uketd_dc
spelling my-utm-ep.53892018-03-07T20:59:41Z Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan 2004-02 Joesni Ralin, Ayu Bidiawati TJ Mechanical engineering and machinery This research address a problem faced by manufacturing companies that is the problem of production scheduling experiencing disruption. The disruption might be caused by changes of priority, new order, and changes of due date in production scheduling. Therefore, the scheduling have been created becomes disturbed. The production scheduling strategies investigated are Priority Dispatching Rules, i.e. (a) First Come First Served (FCFS), (b) Earliest Due Date (EDD), (c) Shortest Processing Time (SPT) and (d) Longest Processing Time (LPT), and are based on non-preemption scheduling and preemption scheduling. Simulation modeling is employed to find out the best strategy out of the four strategies mentioned. The research starts with a case study of production scheduling of a particular company and the understanding of its system's requirements. A basic model was developed from the case study as base of experimentation, evaluation and validation of the simulation model. Then this model is used as the basis in the application of the prioritized dispatching rules of non-preemption scheduling and preemption scheduling system. The basic model is then modified to simulate the preemption production scheduling system. Experiments on the models are conducted and analyzed. The simulation results show that Earliest Due Date (EDD) is the best among the prioritized dispatching rules. The Earliest Due Date (EDD) is also the best rules to do rescheduling for scheduling of non-preemption and scheduling of preemption. 2004-02 Thesis http://eprints.utm.my/id/eprint/5389/ http://eprints.utm.my/id/eprint/5389/1/AyuBidiawatiMFKM2004.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Mechanical Engineering Faculty of Mechanical Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Joesni Ralin, Ayu Bidiawati
Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
description This research address a problem faced by manufacturing companies that is the problem of production scheduling experiencing disruption. The disruption might be caused by changes of priority, new order, and changes of due date in production scheduling. Therefore, the scheduling have been created becomes disturbed. The production scheduling strategies investigated are Priority Dispatching Rules, i.e. (a) First Come First Served (FCFS), (b) Earliest Due Date (EDD), (c) Shortest Processing Time (SPT) and (d) Longest Processing Time (LPT), and are based on non-preemption scheduling and preemption scheduling. Simulation modeling is employed to find out the best strategy out of the four strategies mentioned. The research starts with a case study of production scheduling of a particular company and the understanding of its system's requirements. A basic model was developed from the case study as base of experimentation, evaluation and validation of the simulation model. Then this model is used as the basis in the application of the prioritized dispatching rules of non-preemption scheduling and preemption scheduling system. The basic model is then modified to simulate the preemption production scheduling system. Experiments on the models are conducted and analyzed. The simulation results show that Earliest Due Date (EDD) is the best among the prioritized dispatching rules. The Earliest Due Date (EDD) is also the best rules to do rescheduling for scheduling of non-preemption and scheduling of preemption.
format Thesis
qualification_level Master's degree
author Joesni Ralin, Ayu Bidiawati
author_facet Joesni Ralin, Ayu Bidiawati
author_sort Joesni Ralin, Ayu Bidiawati
title Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
title_short Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
title_full Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
title_fullStr Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
title_full_unstemmed Penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
title_sort penjadualan pengeluaran menggunakan aturan pelepasan berprioriti dalam sistem bergangguan
granting_institution Universiti Teknologi Malaysia, Faculty of Mechanical Engineering
granting_department Faculty of Mechanical Engineering
publishDate 2004
url http://eprints.utm.my/id/eprint/5389/1/AyuBidiawatiMFKM2004.pdf
_version_ 1747814589577297920