Conceptual framework of key performance indicator for industralised building system project in Malaysia
Proper understanding on Key Performance Indicators (KPIs) related to Industrialized Building System (IBS) is important in assisting contractors to formulate effective planning strategic for their company. On the other hand, there are lack of evaluation method to determine degree of successful Indust...
Saved in:
Main Author: | Yan, Kim Leong |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/79085/1/YanKimLeongMFKA2017.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Key performance indicators for value management implementation in construction industry
by: Abd. Kadir, Muhammad Adam
Published: (2013) -
A machine learning-based framework for delay risk mitigation in building projects
by: Sanni-Anibire, Muizz Oladapo
Published: (2021) -
Formulation of key performance indicators through implementation of private finance initiatives (PFI) in student hostel privatisation at Universiti Teknikal Malaysia Teknikal
by: Anang Masuri, Mohd. Rayme
Published: (2009) -
The conceptual model of life cycle costing automation on green building energy efficient criteria
by: Sadeli, Salina
Published: (2015) -
Development of integrated floating house conceptual model for flood prone area in Malaysia : NOAH project
by: Yau Patrick, Siaw Yang
Published: (2007)