Development of cost driven work breakdown structure for project monitoring and controlling
One of the major issue in evaluating project work progress is due to theseparation between the work item in Bill of Quantities (BoQ) and physical activitiesproject schedule. This condition led to many problems such as the variances in projectperformance measurement from the physical schedule progres...
Saved in:
Main Author: | Mohamad @Harun, Norhamidah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/79436/1/NorhamidahMohamadMFKA2015.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of common work breakdown structure (WBS) for school project
by: Abdullah, Azhar
Published: (2006) -
Scheduling software as a tool for monitoring and controlling JKR project
by: Sin, Zainal Abidin
Published: (2011) -
Improved PID controller based on piecewise affine function in data driven control framework
by: Mohd Ikhmil Fadzrizan, Mohd Hanif
Published: (2022) -
Electrical breakdown and mechanical ageing in dielectric elastomers
by: Shamsul, Zakaria
Published: (2016) -
Safe experimentation dynamics algorithm for data-driven PID controller of a class of underactuated systems
by: Nor Sakinah, Abdul Shukor
Published: (2019)