Construction bid model for residential building projects in Dubai
Many construction firms face hardships during the economic crisis due to inaccurate bidding and difficulty in obtaining new projects because of cost fluctuation. The best option for construction firms during an economic crisis is to control their construction bid costs that fit the situation. The bi...
محفوظ في:
المؤلف الرئيسي: | Al Janabi, Tamadhur H. F. |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2018
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/79549/1/TamadhurHFPFKA2018.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Selection factor to bid or not to bid for extra low voltage system (ELV) project
بواسطة: Khairul Anuar, Mohamad Amir Syafiq
منشور في: (2019) -
Predicting the performance of design-bid-build projects: a neural-network based approach
بواسطة: Tan, Caren Cai Loon
منشور في: (2006) -
Improvement measures of cost overruns in residential construction project in Malaysia
بواسطة: Rahim, Nur Syafika Artika
منشور في: (2020) -
Procurement methods and contractor's bidding strategy in Middle East construction industry
بواسطة: Amirsoleimani, Omidreza
منشور في: (2014) -
Time and budget overrun in the construction of town houses in Dubai U.A.E
بواسطة: Shaikh, Abdul Wahab
منشور في: (2012)