Risk management of design and build project
Design and build procurement method offer an alternative contracting route apart from traditional method. The significance advantage of design and build procurement method is it provides the client with single management point. With this contracting arrangement, client requires to appoint main contr...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/81455/1/NurulKhalidaAmatMSKA2019.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.81455 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.814552019-08-23T05:18:50Z Risk management of design and build project 2019 Amat Bakri, Nurul Khalida TA Engineering (General). Civil engineering (General) Design and build procurement method offer an alternative contracting route apart from traditional method. The significance advantage of design and build procurement method is it provides the client with single management point. With this contracting arrangement, client requires to appoint main contractor that shall responsible for both design and construction of project. Despite this advantage, design and build project can be very risky to both of owner and contractor. Therefore, this study has been conducted to carry out risk assessment on the design and build approach. This study commenced with the project identification of risks that are adopt for design and build approach. Next, risk analysis has been carried out to evaluate the impact of risk to project cost, duration and quality. The methodology used to carry out this study are by means of literature review study, interviews with industry experts and conducting questionnaire survey. The result from this study has enabled the risk to be classified into low, medium and high classification. Apart from that, this study also proposed risk mitigation strategies for the project that are categorised as highrisk item. Finally, it is hope that the findings from this study will be able to provide some insight for those who are implementing the design and build project. 2019 Thesis http://eprints.utm.my/id/eprint/81455/ http://eprints.utm.my/id/eprint/81455/1/NurulKhalidaAmatMSKA2019.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125203 masters Universiti Teknologi Malaysia Civil Engineering |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
language |
English |
topic |
TA Engineering (General) Civil engineering (General) |
spellingShingle |
TA Engineering (General) Civil engineering (General) Amat Bakri, Nurul Khalida Risk management of design and build project |
description |
Design and build procurement method offer an alternative contracting route apart from traditional method. The significance advantage of design and build procurement method is it provides the client with single management point. With this contracting arrangement, client requires to appoint main contractor that shall responsible for both design and construction of project. Despite this advantage, design and build project can be very risky to both of owner and contractor. Therefore, this study has been conducted to carry out risk assessment on the design and build approach. This study commenced with the project identification of risks that are adopt for design and build approach. Next, risk analysis has been carried out to evaluate the impact of risk to project cost, duration and quality. The methodology used to carry out this study are by means of literature review study, interviews with industry experts and conducting questionnaire survey. The result from this study has enabled the risk to be classified into low, medium and high classification. Apart from that, this study also proposed risk mitigation strategies for the project that are categorised as highrisk item. Finally, it is hope that the findings from this study will be able to provide some insight for those who are implementing the design and build project. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Amat Bakri, Nurul Khalida |
author_facet |
Amat Bakri, Nurul Khalida |
author_sort |
Amat Bakri, Nurul Khalida |
title |
Risk management of design and build project |
title_short |
Risk management of design and build project |
title_full |
Risk management of design and build project |
title_fullStr |
Risk management of design and build project |
title_full_unstemmed |
Risk management of design and build project |
title_sort |
risk management of design and build project |
granting_institution |
Universiti Teknologi Malaysia |
granting_department |
Civil Engineering |
publishDate |
2019 |
url |
http://eprints.utm.my/id/eprint/81455/1/NurulKhalidaAmatMSKA2019.pdf |
_version_ |
1747818336019808256 |