Developing a generic safety performance evaluation prototype for construction projects in Malaysia
Despite recent efforts that have been made to improve construction safety, this industry yet considered unsafe (hazardous) due to high number of recorded accident. Based on the statistics released by Department of Occupational Safety and Health (DOSH) in Malaysia, between 2009 to 2015 the highest ra...
Saved in:
Main Author: | Bavafa, Ali Asghar |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/81796/1/AliAsgharBavafaPFKA2017.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluation of construction time performance and waste time reduction by utilizing lean paradigm
by: Bavafa, Ali Asghar
Published: (2012) -
Safety budgeting cost for construction project
by: Abd. Latib, Firdaus
Published: (2014) -
The challenges in international construction project with regard to safety compliance and cross cultural management
by: Mohd. Radzuan, Nor Amin
Published: (2008) -
Poor performance of public construction project in Malaysia
by: Jatarona, Nurul Alifah
Published: (2018) -
Reliability of safety performance indicator: compliance and effectiveness of safety programs in construction site
by: Shanmugam, Rames Kumar
Published: (2015)